Work continues on building our LED Sign trailer. The trailer is being built using 2x4s and plywood. Also we have manufactured a plastic bending fixture that will allow us to bend plastic sheets. The sheets will provide custom enclosures for the LED sign boards.

Other projects around the garage include, installing a low pressure air line to the front of the garage to allow us to use low pressure painting equipment. LED strobe lights were purchased and now custom holders are being fabricated to allow install them on a traffic barrier.

The fabrication is being done with our tig welder. This is good practice for a very difficult art form of welding.