Election Day 2012

Thursday, January 27, 2011

Monday January 24th, 2011

Another busy and productive night at CD HQ.

Work continues on the generator project on the bucket truck. The electrical panel was installed with its custom bracket and flexible steel pipe was run from the generator to the panel.


The office has purchased a large scale color printer. The printer will print sizes up to 13 inches by 44 inches. It was installed on our computer network and is available to print large scale color maps and other items.

Our constantly growing inventory of hardware has become overflowing and not organized. The past 2 weeks trays and boxes of nuts, bolts and other hardware has been labeled and put in a more organized fashion for easy use.

Body work continued on the small dent in the bucket truck hood.

Our weekly test of our backup generator to power SCD did not run this monday night. It was extremely cold with temperatures below zero that Monday morning. It was discovered that the generator might have issues with getting enough natural gas that is shared from the building and heating system to start the generator. CD members are investigating the problem and believe that during a real power outage, gas flow will be not flowing to the heating system and the generator will get enough natural gas to start.



No comments:

Post a Comment