After the Thanksgiving holiday and some relaxing vacation the CD blog is back. Lots of work has progressed since our last post and this post will have the rundown of the events.

Work is progressing on our radio console project. The garage has been outfitted with a beam dolly and a new chain hoist. This was used this monday to lift the generator into the Bucket Truck. A small white board was installed in the entrance of the EOC. Work has begun on our staff room upgrades.

The staff room has had the light fixtures cleaned and installed all new bulbs. This week work has begun on replacing ceiling tiles. The next part of the project will be installing a new light fixture over our locker room area.

Generator mounts were fabricated using the same techniques and materials that were used in the generator install in the Utility truck. Holes were being drilled and a exhaust port was made using our plasma cutter.

See photos below of the progress in each project.