The holiday season is in full swing, and a small group met this monday night. Work finished on the staff room renovations, all ceiling tiles were installed, and the room was cleaned. The generator project continues on the Bucket Truck, with work progressing nicely. See pictures below of members working under the Bucket Truck.

Happy Holidays from Sharon Civil Defense Department!


Tuesday, December 14, 2010

Monday December 13th 2010

Another busy night at Sharon's Civil Defense Headquarters. Projects that were worked on this night were: Installing a new light over the bunk room in our staff room, putting up ceiling tiles in the staff room, and more work on the generator install in the bucket truck.

A custom venting system was welded and installed on the generator and then the generator was test fitted to the truck.

See photos below of the night's activities:




Saturday, December 11, 2010

Captial Request FY12

Director Polimer meet with the Captial Outlay Committee on thursday to discuss the departments captial projects for the coming fiscal year. Also discussed was a joint effort for a new large steel building to hold DPW equipment. This new building would free up space in the existing building shared by CD and DPW.

The "old DPW building" would then become a joint building with the Police Department. This project would greatly increase the size of the CD's garage space.

Click the link on Captial Outlay Meeting, December 9th to stream. Or right click and save to download.

http://www.sharontv.com/gov_replays.html

Tuesday, December 7, 2010

Monday December 7, 2010

After the Thanksgiving holiday and some relaxing vacation the CD blog is back. Lots of work has progressed since our last post and this post will have the rundown of the events.

Work is progressing on our radio console project. The garage has been outfitted with a beam dolly and a new chain hoist. This was used this monday to lift the generator into the Bucket Truck. A small white board was installed in the entrance of the EOC. Work has begun on our staff room upgrades.

The staff room has had the light fixtures cleaned and installed all new bulbs. This week work has begun on replacing ceiling tiles. The next part of the project will be installing a new light fixture over our locker room area.

Generator mounts were fabricated using the same techniques and materials that were used in the generator install in the Utility truck. Holes were being drilled and a exhaust port was made using our plasma cutter.

See photos below of the progress in each project.